Our Contracts team, led by David Stewart and managed by Kris Harvey, has recently completed a major refurbishment of the changing rooms at St Leonard's, University of Edinburgh. Working with George Muir, Design Manager, and Adrian Cavaye, Interior Designer, at The University of Edinburgh Estates Department, the project involved a full strip-out and refurbishment of the existing changing rooms, as well as the addition of two accessible toilet and shower rooms.
The refurbishment was designed to create a more modern and inclusive space for students and staff to use. The new changing rooms feature bright and airy spaces, with new flooring, lighting, and fixtures. The accessible toilet and shower rooms are designed to meet the needs of all users, with features such as grab bars, wider doorways, and lowered sinks.
The project was completed on time and within budget, and we are absolutely delighted with the results. The new changing rooms have been well-received by students and staff, and the accessible toilet and shower rooms have made a real difference to the lives of many users.
Key Features of the Refurbishment:
Full strip-out and refurbishment of existing changing rooms
Addition of two accessible toilet and shower rooms
Bright and airy spaces with new flooring, lighting, and fixtures
Accessible toilet and shower rooms designed to meet the needs of all users
Benefits of the Refurbishment:
More modern and inclusive changing rooms for students and staff
Accessible toilet and shower rooms that make a real difference to the lives of many users
Project completed on time and within budget
As a Group, we are committed to providing our clients with the best possible service and experience. Insite Contracts works closely with its clients to understand their needs and requirements, and to develop a project plan that meets their budget and schedule.
Comments